McConnell Dowell will take primary responsibility for the training wall installing driven piles and a 6 m wide concrete deck. The challenge was to provide precise positioning and guidance information to the piling barge operator in order to ensure both vertical and raked piles would be installed to project specification. The goal was to eliminate the need for shore based surveyor, saving time and expense involved in communication and co-ordination with personnel.
| Attachment | Size |
|---|---|