Land Reclamation - Marine Rock Placing

The systems offered great accuracy position and depth information, the crane operators were able to accurately and efficiently place rock onto the entire designed locations, precisely meeting design specifications. Despite the challenge of the enormity of the project and the tightness of its schedule, the project is on track to finish on time and accurate thanks to the navigation and positioning solution.

Customer: 
Oung Construction (S) Pte Ltd
Location: 
Pasir Panjang Terminal Phase 3 & 4, Singapore
PPT